February 2007
Search    

Heat wave

Heat wave not ratednot ratednot ratednot ratednot rated

Sarnafil Waterproofing Systems (Shanghai) installs a roof on a China manufacturing plant

by Krista Berns
Be the first to comment


Guangzhou Honda's second manufacturing plant is located in the Xintang section of Zengcheng, Guangzhou City, China, about 19 miles from its original plant. Before building the 1.9-million-square-foot building, which now manufactures Honda cars, careful planning was involved and choosing a satisfactory roofing contractor was important.

Sarnafil Waterproofing Systems (Shanghai) Ltd., Shanghai, China—now part of Sika AG, Baar, Switzerland—learned about the project through the Dongfeng Design Institute Co. Ltd. Southern Co., Guangzhou City, the architect for the project, and Sarnafil Waterproofing Systems (Shanghai) bid the project and was chosen to install the new building's roof system.

Climate control

Sarnafil Waterproofing Systems (Shanghai) was asked to install a PVC roof system on the building, which included...



Web exclusive: Click below for more information.
Contact information for Sika Sarnafil Waterproofing Systems



To read the article in its entirety, please log in or register (registration is free).

Log in or register for FREE access to this article and other Professional Roofing online content.

Not a professionalroofing.net user?

Register now for free access
  • Full access to every article
  • Online Web exclusive information
  • Photo gallery
  • Breaking news
  • Online classified ads

Already a professionalroofing.net user?

Log in now

User name:

Password:

 


Login help
Click here to have your user name and password emailed to you.




Comments (0) Login to post a comment or rating
There are no comments posted.

NRCA NRCA